Palvolgyi, D and Csapo, G and Wortel, M (2011) Strategic bidding in a primary reserve auction. [Study Group Report]
|
PDF
311kB |
Abstract
Electricity grids are subject to a constant change of demand. If a power line is overloaded, the demand is rerouted to another line, which is then also likely to overload due to the sudden spike in voltage. Due to this cascading effect a grid-wide blackout is not at all improbable; one occurred in Italy in 2003. The costs of such a blackout are immense in today’s modern society. Transport and telecommunication systems have such a high power demand that a backup power generator system would come at a very high cost. To solve this, Germany requires the electricity grid operators to have Primary Reserve Capacity on standby...
Item Type: | Study Group Report |
---|---|
Problem Sectors: | Discrete Energy and utilities |
Study Groups: | European Study Group with Industry > ESGI 79 (Amsterdam, Netherlands, Jan 24-28, 2011) (SWI 2011) |
Company Name: | Statkraft |
ID Code: | 588 |
Deposited By: | Mark Curtis |
Deposited On: | 29 Oct 2012 16:26 |
Last Modified: | 29 May 2015 20:12 |
Repository Staff Only: item control page